
Use Cases and Lifestyle
Moving House Broadband Checklist UK
Sort broadband as soon as you know the new address.
The quick answer
Sort broadband as soon as you know the new address. Check availability there, then transfer your current contract, place a new order, or leave if the provider cannot serve the property. One Touch Switch is for changing provider at your current address. A house move is usually a transfer or a new installation. If you want the old and new lines to overlap, cancel the old service yourself. Take the provider router with you and leave any Openreach fibre box that belongs to the property.
Key Takeaways
- Start with an address check the day you know the new postcode, then book a transfer or a new order rather than leaving broadband until packing week.
- One Touch Switch is for changing provider at your current address. Ofcom says it does not apply if you manage your own overlap, which is the usual house-move pattern.
- Take the provider router. Leave an Openreach optical network terminal or fibre modem that is fixed at the old property, as BT tells movers to do.
- Transfer fees and notice periods are set by the provider. Current official examples include Virgin Media from £20, Sky £50 unless you have Sky VIP, and BT generally no move fee unless a new line is needed.
Start broadband planning the day you know the new address, then work backwards from moving day. Check what is available there first. Then either transfer the current contract, place a new order, or leave if the provider cannot serve the property. Openreach tells movers to treat broadband as a priority as soon as they have a completion date, especially for a new build that already has a fibre socket.
One Touch Switch is for changing provider at your current address, not for a house move. Ofcom designed One Touch Switch for that same-address change. A house move is usually a home-move transfer or a new installation at a different property. If you want the old and new lines to overlap, Ofcom says you manage the cancellation yourself and One Touch Switch does not apply.
Moving house broadband timeline
| When | What to do | Why it matters |
|---|---|---|
| As soon as you have the new address | Check providers and connection type at the exact address, not just the town. | Virgin Media, full fibre and older copper services are not interchangeable between streets. |
| Four weeks before | Compare a transfer with a new-customer order. Ask the current provider about remaining term, any move fee and whether the same speed exists at the new home. | A slower technology at the new address can change the package even if the brand is available. |
| Two to four weeks before | Book the transfer or new order. Sky asks for 2 to 4 weeks. BT asks you to try for two weeks. Virgin Media can self-install from about three days where the network is already in the property. | Engineer slots for a first full-fibre install take longer than a self-install on an existing socket. |
| One week before | Confirm activation and stop dates in writing. Pack the provider router separately. Photograph the socket or fibre box at both properties. | A previous occupant's live service can delay a working-line takeover if they have not cancelled. |
| Moving day | Plug the router into the correct socket or Openreach ONT. Keep mobile data as backup. Do not cancel the old line until the new one works, unless the provider has already set a stop date. | If a promised start date slips, providers in Ofcom's automatic compensation scheme pay £6.46 for each calendar day of delay. |
| After you move | Test the line, return kit you no longer need, and keep the final bill and any cooling-off deadline. | You have 14 calendar days to cancel a new order. If the service has started you may still pay for use and installation. |
Use our postcode comparison for the new address before you accept a transfer. If you are unsure what speed the household needs, the speed-need guide is the next stop.
Transfer, new order or leave?
| Option | Use when | Watch for |
|---|---|---|
| Transfer the current contract | The same provider can serve the new address and you want to keep the remaining term. | A move fee, a slower technology, or a new minimum term if you upgrade. BT says remaining term transfers if you take the same service, but a term under three months becomes a new three-month contract. |
| New order at the new address | You are out of contract, the current brand is missing, or a better full-fibre option exists. | This is a new installation, not One Touch Switch, if the old service is at a different property. Set a stop date on the old account yourself if you need overlap. |
| Leave the current provider | They cannot serve the new address, or you prefer a different network such as Virgin Media or an altnet. | Citizens Advice says you might still face a cancellation fee if they cannot provide the same service, and you should ask them to reduce or remove it. Do not assume a waiver until it is confirmed in writing. |
Can I take my broadband to my new home?
Often yes, if the same provider covers the new property. Citizens Advice says you should check whether they offer the same service in the new area, and that a small fee can apply to move it. Official current examples: Virgin Media charges £20 to transfer, or £35 if the package changes; Sky charges £50 unless you have Sky VIP; BT says there is generally no home-move fee, with a £30 or £70 connection charge only if a new BT line is needed and you stay on the old package.
Coverage is not the same as the same speed. Openreach warns that moving from full fibre to fibre-to-the-cabinet, or the other way, can change setup and speeds. Virgin Media uses its own network, so a street that looks nearby can still be off-net. Check the exact address before you promise the household it will “just move”.
How far in advance to order broadband when moving
Book once the moving date is firm enough for the provider to hold a slot, then keep a buffer. Sky says it needs two weeks' notice and that a transfer can take up to 10 working days. BT asks you to try for two weeks and says the process can take two weeks, though it is often faster. Virgin Media says a self-install can be ready in as little as three days, with an engineer visit usually around 7 to 14 days, and you must leave at least one day between disconnecting the old home and activating the new one.
First-time full fibre at an existing house, a missing socket, or a new-build ONT that is not yet live can take longer. Openreach says timescales depend on what is already in the property. If the provider misses a promised start date, Ofcom's automatic compensation scheme pays £6.46 for each calendar day of delay for signed-up providers, and £32.31 for a missed engineer appointment.
What to pack, and what to leave
| Item | Take or leave | Source |
|---|---|---|
| Provider router or hub | Take it, unless you are leaving that provider and they have asked for it back. | BT: take the Hub. Openreach: plug the router into the ONT once the service is ready. |
| Openreach fibre modem or ONT | Leave it at the old property if it is the wall-mounted fibre box. | BT: leave an Openreach fibre modem for the people who move in. Openreach: new builds already have an ONT. |
| Sky dish | Leave the dish. Take Sky Glass or Sky Stream with you. | Sky help: leave the dish; Glass and Stream do not need a home-move booking in the same way. |
| Your own mesh kit and cables | Take them. They are not tied to the old line. | Test Wi-Fi in the rooms you will actually use after the line is live. |
If you later switch provider rather than transferring, use the One Touch Switch guide at the new address once you live there. That is a same-address switch, not a house move.
Broadband not available at my new address
If the current provider cannot serve the new property, ask in writing what they will charge to end the contract. Citizens Advice says a cancellation fee might still apply and that it is worth explaining the move because some providers reduce or remove it. Treat any waiver as a confirmed account note, not a rumour.
Then check what actually exists at the new address: Openreach full fibre, Virgin Media, an altnet, or only slower copper. A rolling monthly or 12-month deal can be rational if you might move again. Eligible households should check social tariffs before signing a long expensive term. Rural or new-build gaps belong in the rural broadband guide rather than a guess that “fibre will arrive next month”.
One Touch Switch versus a house move
One Touch Switch is the standard way to change broadband provider where you already live. You contact the provider you want to join. They match the current service, send the switching information (including any early termination charge) and, if you go ahead, arrange the cutover. Your old service should then stop automatically. Ofcom says any loss of service on that process should not last longer than one working day, and the old provider must not charge you for a notice period after the switchover date.
A house move is different because the new line is at another address. If you want broadband at both homes during the move, Ofcom says you manage your own switch: order the new service, cancel the old one separately, and accept that One Touch Switch does not apply. That overlap is how you avoid a dark week, but you may pay for both services for a few days. Our longer rights explainer is still broadband when moving house, including contract and landline context.
Phone line, telecare and moving day
Openreach is upgrading the UK to digital phone lines by January 2027, so a new address may already run voice through the router. Check telecare, alarms and older handsets before you unplug anything. If you need to keep a landline number, ask during the order: BT says you can usually keep it when the new home uses the same exchange, and you cannot keep it when the dialling code changes. Sky says you will not keep the old landline number on a home move. The landline switch-off guide covers backup power and alarms.
On the day, plug in, test, then worry about mesh Wi-Fi. If the line is live but one room is dead, that is a Wi-Fi problem, not a failed move. Keep the activation email. If an engineer is due, someone needs to be in; Ofcom compensation for a missed appointment is £32.31 where the scheme applies.
Buying checklist before you sign
- Write down the new address, moving date, current provider, account number and remaining minimum term.
- Check availability and typical speed at the exact address, including whether an engineer or self-install is needed.
- Ask whether a transfer keeps the remaining term or starts a new one, and get any move fee in writing.
- If you are leaving, ask in writing whether an early termination charge applies because of the move.
- Set activation and stop dates so the old line does not die before the new one works, unless you accept a gap.
- Pack the router. Leave any Openreach ONT. Return kit only after the new service is working if you are changing provider.
- If anyone relies on a landline or telecare, confirm Digital Voice compatibility before you unplug.
Compare deals now
Today's best broadband deals — sorted by price.
We may earn a commission when you click a “Get Deal” button. This does not affect our editorial independence.
- Best Value
- Speed
- 150 Mbps
- Monthly price
- £12.50/mo
- Contract
- 12 months
- Speed
- 35 Mbps
- Monthly price
- £18.50/mo
- Contract
- 12 months
- Fastest
- Speed
- 300 Mbps
- Monthly price
- £19.00/mo
- Contract
- 18 months
| Provider | Speed | Monthly price | Contract | Affiliate link |
|---|---|---|---|---|
150 Mbps Superfast | £12.50/mo | 12 months | ||
35 Mbps Superfast | £18.50/mo | 12 months | ||
300 Mbps Ultrafast | £19.00/mo | 18 months |
Frequently Asked Questions
Editorial and Source Notes
We review guides against our published methodology and add source links where external verification materially helps the reader check claims, dates, and regulator-backed context.
- BroadbandPicker review methodology
- BroadbandPicker editorial policy
- Openreach: moving home checklist, new-build ONT, FTTP versus FTTC and digital phone lines by January 2027, verified 17 September 2026
- Ofcom: switching broadband with One Touch Switch, managing your own overlap, 14-day cooling-off and early termination charges, verified 17 September 2026
- Ofcom: automatic compensation for delayed starts and missed engineer appointments, verified 17 September 2026
- Citizens Advice: moving house with a phone or internet contract, verified 17 September 2026
- BT: moving home, take the Hub, leave the Openreach fibre modem, notice and remaining term, verified 17 September 2026
- BT: home-move notice, same-contract transfer and connection fees for a new line, verified 17 September 2026
- Virgin Media: home move from £20, self-install from three days, engineer 7 to 14 days, verified 17 September 2026
- Sky: 2 to 4 weeks notice, up to 10 working days, £50 unless Sky VIP, verified 17 September 2026